Skip to content

INDIAN BUREAUCRACY,BUREAUCRACY NEWS – SARKARIMIRROR

Updated news on Indian Bureaucracy , Bureaucracy News,IAS News ,IPS News Political News ,Events in India,Corporate & International news

  • Home
  • About Us
    • About Editor -in-Chief
  • Post your coverages
    • International
  • Bureaucracy Updates
    • PSU
  • Current News
  • State
  • Corporate
  • Central Government Schemes
  • Latest News
    • Health & Fitness
  • Excl. Interviews
  • About Editor -in-Chief
  • Post your coverages
  • Advertise with us
  • WRITE FOR SARKARIMIRROR
  • Converse with Tarun – Exclusive Video interviews

the required coal linkage for NTPC plant will be taken up by the Telangana government with Government of India. He has agreed to provide the required land in Toto either from out of the available land

NTPC TO GO AHEAD WITH SET UP OF 4000 MW POWER GENERATION PLANT AT RAMAGUNDAM
PSU 

NTPC TO GO AHEAD WITH SET UP OF 4000 MW POWER GENERATION PLANT AT RAMAGUNDAM

July 8, 2014 sarkarimirror CMD Genco and Sri. S.Narsing Rao Prl.Secy. to CM are present in the meeting., cmd ntpc, current affairs, Director (Operations), Director (Technical), government of india news, Hyderabad that, india, india news, indian goevrnemnt, New Delhi: NTPC Limited has agreed to set up 4000 MW Power Generation Plant at Ramagundam adjacent to their existing units as an expansion unit. The Honourable Chief Minister assured the NTPC Chairman, NTPC, NTPC LATEST POWER PROJECTS, NTPC NEW PROJECTS, ntpc news, NTPC TELANGANA PROJECTS, political news, Prl. Secretary Energy & CMD Transco, Regional Executive Director (South) have called on the Chief Minister. Sri.Suresh Chanda, Sri. R.Venkateswaran, Sri.A.K.Jha, Sri.D.Prabhakar Rao, Sri.N.N.Misra, the required coal linkage for NTPC plant will be taken up by the Telangana government with Government of India. He has agreed to provide the required land in Toto either from out of the available land, who called on him today at Secretariat

 New Delhi: NTPC Limited has agreed to set up 4000 MW Power Generation Plant at Ramagundam adjacent to their existing

Read more

Tarun Sharma,Editor-in- Chief

Screenshot 2020 11 29 11 27 00 253 Com.lightricks.facetune.free

August 2022
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Jul    
Copyright © 2022 INDIAN BUREAUCRACY,BUREAUCRACY NEWS – SARKARIMIRROR. All rights reserved.
Theme: ColorMag by ThemeGrill. Powered by WordPress.