Tag: the Vyasi HEP is a run of the river scheme on the river Yamuna. Water from the Vyasi reservoir will be diverted by constructing an 86 m high dam through a 2.7 Km long head race tunnel to the surface p

Posted in PSU

BHEL wins order for 120 MW Hydro Electric Project in Uttarakhand

BHEL wins order for 120 MW Hydro Electric Project in Uttarakhand New Delhi, March 31: In the face of stiff international competition, Bharat Heavy Electricals…

Continue Reading